Skip to content

APPLICATIONS · SEWAGE TREATMENT PLANTS

Precise process measurement technology for sewage treatment works & wastewater management

Increase efficiency, reduce polymer consumption and optimise sludge dewatering with MWM tec

The cost-effective operation of modern wastewater treatment plants depends largely on precise, data-driven process control. Constantly changing influent loads, challenging sludge qualities and cost-intensive dewatering processes require comprehensive and reliable monitoring of solids concentration.

With its MicroSinus measurement system, MWM tec GmbH offers a solution for the harsh conditions of sewage treatment plant operations: using the microwave transmission method, you can continuously determine the dry solids content (TS content) and the density of sewage sludge in real time, directly within the process. This online monitoring complements laboratory reference data and provides continuous data for the cost-effective management of your sludge treatment line.

Key applications in the sewage treatment process

Our system can be flexibly installed on pipework and tanks and optimises key stages of your sludge treatment:

Excess sludge removal & thickening

Continuous online monitoring of solids concentration for precise control of sludge discharge. This prevents undesirable hydraulic overload of the subsequent stages.

Control of sludge dewatering (centrifuges, presses)

Precise determination of the dry solids (TS) content in the feed to decanters, chamber filter presses or screw presses. The system enables the fully automatic, demand-based dosing of flocculants (polymers).

Digested sludge monitoring (digester management)

Continuous density measurement in the recirculation loop of the digestion tower. This ensures homogeneous mixing, prevents biological overfeeding and optimises agitator running times.

Your benefits at a glance

Process challengeMWM tec (MicroSinus) approachEconomic added value
High costs for polymersReal-time TS measurement immediately prior to dewateringDrastic reduction in polymer consumption through precise real-time dosing.
Wear caused by abrasive mediaWear-free in-line sensor technology with no moving partsMinimised maintenance and downtime, even with sandy slurries.
Varying degrees of dewateringContinuous volume measurement in the main streamMaximised degree of dewatering, resulting in significantly lower landfill and transport costs (cake weight).
Measurement errors caused by depositsOptically independent microwave transmission methodReliable measurements regardless of turbidity, fat or sludge deposits on the pipe walls.
Total solids measurement in wastewater treatment plants – German

WASTEWATER TREATMENT LEAFLET

Total solids measurement in wastewater treatment plants

The German wastewater treatment leaflet shows the measurement principle and installation examples for primary and digested sludge.

PDF · 2.5 MB · 2 pages · German

MWMtec & MicroSinus – English

BROCHURE

MWMtec & MicroSinus

Measurement principle, applications and technical specifications in one brochure.

PDF · 3.3 MB · 4 pages · English

Primary clarification and primary sludge

Measuring points at the primary clarifier outlet and directly at the sludge withdrawal point.

Primary sludge: Pipework DN 200, Rod probes with flushing adapter – Primary clarifier outlet, after the grinder.
After the grinderInstallation example 01 · Enlarge photo ↗

Primary sludge

After the grinder

Primary clarifier outlet, after the grinder.

Installation
Pipework DN 200
Sensors
Rod probes with flushing adapter
Measured variable
Total solids (TS)
Primary sludge: Measuring fitting DN 150, Rod probes with flushing adapter – Primary clarifier outlet, after the grinder.
Measuring fitting after the grinderInstallation example 02 · Enlarge photo ↗

Primary sludge

Measuring fitting after the grinder

Primary clarifier outlet, after the grinder.

Installation
Measuring fitting DN 150
Sensors
Rod probes with flushing adapter
Measured variable
Total solids (TS)
Primary sludge: Pipework DN 150, Rod probes with flushing adapter – Measuring point at the primary clarifier outlet.
Primary clarifier outletInstallation example 09 · Enlarge photo ↗

Primary sludge

Primary clarifier outlet

Measuring point at the primary clarifier outlet.

Installation
Pipework DN 150
Sensors
Rod probes with flushing adapter
Measured variable
Total solids (TS)
Primary sludge: Pipework DN 150, Rod probes with flushing adapter – Measuring point directly at the outlet of the primary clarifier.
Directly at the primary clarifierInstallation example 13 · Enlarge photo ↗

Primary sludge

Directly at the primary clarifier

Measuring point directly at the outlet of the primary clarifier.

Installation
Pipework DN 150
Sensors
Rod probes with flushing adapter
Measured variable
Total solids (TS)
Primary sludge: Measuring fitting DN 150, Rod probes with flushing adapter – Total solids measurement directly at the outlet – installation example 1.
Measuring fitting on the sludge outletInstallation example 14 · Enlarge photo ↗

Primary sludge

Measuring fitting on the sludge outlet

Total solids measurement directly at the outlet – installation example 1.

Installation
Measuring fitting DN 150
Sensors
Rod probes with flushing adapter
Measured variable
Total solids (TS)
Primary sludge: Measuring fitting DN 150, Rod probes with flushing adapter – Total solids measurement directly at the outlet – Installation example 2.
Measuring fitting on the sludge outletInstallation example 15 · Enlarge photo ↗

Primary sludge

Measuring fitting on the sludge outlet

Total solids measurement directly at the outlet – Installation example 2.

Installation
Measuring fitting DN 150
Sensors
Rod probes with flushing adapter
Measured variable
Total solids (TS)

Thickening

Total solids measurement after the pre-thickener and at the thickener outlet.

Primary sludge: Pipework DN 200, Rod probes with flushing adapter – Measuring point after the pre-thickener.
After the pre-thickenerInstallation example 05 · Enlarge photo ↗

Primary sludge

After the pre-thickener

Measuring point after the pre-thickener.

Installation
Pipework DN 200
Sensors
Rod probes with flushing adapter
Measured variable
Total solids (TS)
Primary sludge: Pipework DN 150, Rod probes with flushing adapter – Measuring point at the thickener outlet.
Thickener outletInstallation example 10 · Enlarge photo ↗

Primary sludge

Thickener outlet

Measuring point at the thickener outlet.

Installation
Pipework DN 150
Sensors
Rod probes with flushing adapter
Measured variable
Total solids (TS)

Secondary clarification and digestion

Excess sludge at the secondary clarifier withdrawal point and measuring points at the digester.

Excess sludge: Measuring fitting DN 125, Planar probes – Measuring point at the outlet of the secondary clarifier.
Sludge withdrawal from the secondary clarifierInstallation example 06 · Enlarge photo ↗

Excess sludge

Sludge withdrawal from the secondary clarifier

Measuring point at the outlet of the secondary clarifier.

Installation
Measuring fitting DN 125
Sensors
Planar probes
Measured variable
Total solids (TS)
Primary sludge: Pipework DN 200, Rod probes with flushing adapter – Inlet to the digester.
Digester inletInstallation example 04 · Enlarge photo ↗

Primary sludge

Digester inlet

Inlet to the digester.

Installation
Pipework DN 200
Sensors
Rod probes with flushing adapter
Measured variable
Total solids (TS)
Sludge in the circulation pipe: Pipework DN 150, Rod probes with flushing adapter – Circulation pipe from the digester.
Circulation at the digesterInstallation example 03 · Enlarge photo ↗

Sludge in the circulation pipe

Circulation at the digester

Circulation pipe from the digester.

Installation
Pipework DN 150
Sensors
Rod probes with flushing adapter
Measured variable
Total solids (TS)

Polymer dosing and dewatering

Measuring points for polymer dosing and polymer control upstream of the centrifuge.

Digested sludge: Pipework DN 150, Rod probes with flushing adapter – Measuring point upstream of the polymer dosing unit.
Before polymer dosingInstallation example 07 · Enlarge photo ↗

Digested sludge

Before polymer dosing

Measuring point upstream of the polymer dosing unit.

Installation
Pipework DN 150
Sensors
Rod probes with flushing adapter
Measured variable
Total solids (TS)
Digested sludge: Pipework DN 65, Rod probes with flushing adapter – Total solids measurement for polymer dosing.
Polymer dosing in DN 65Installation example 08 · Enlarge photo ↗

Digested sludge

Polymer dosing in DN 65

Total solids measurement for polymer dosing.

Installation
Pipework DN 65
Sensors
Rod probes with flushing adapter
Measured variable
Total solids (TS)
Digested sludge: Pipework DN 150, Rod probes with flushing adapter – Total solids measurement for polymer dosing.
Polymer dosing in DN 150Installation example 11 · Enlarge photo ↗

Digested sludge

Polymer dosing in DN 150

Total solids measurement for polymer dosing.

Installation
Pipework DN 150
Sensors
Rod probes with flushing adapter
Measured variable
Total solids (TS)
Primary sludge: Measuring fitting DN 150, Rod probes with flushing adapter – Total solids measurement at the inlet of the centrifuge for polymer control.
Centrifuge inletInstallation example 12 · Enlarge photo ↗

Primary sludge

Centrifuge inlet

Total solids measurement at the inlet of the centrifuge for polymer control.

Installation
Measuring fitting DN 150
Sensors
Rod probes with flushing adapter
Measured variable
Total solids (TS)

Technical highlights for plant manufacturers and operators

The transmission principle detects the slurry within the measurement volume rather than just at its surface. The multi-frequency analysis provides the basis for continuous dry solids (TS) determination. The measured values can be integrated into the slurry control system via the specified industrial interfaces; the existing installation examples show pipework and measuring fittings with rod and planar probes.

Further applications

YOUR TRANSLATION TASK

Ready for process optimisation?

Take advantage of our many years of application expertise for your wastewater treatment plant. We would be happy to analyse your specific requirements and configure the optimal measurement system to ensure your success.

Start an application enquiry ↗

← All applications